Blog›Mining Project Control Software: What You Need to Know
Mining

Mining Project Control Software: What You Need to Know

July 15, 2026 · 9 min read · ⛏️

43%

Mining CAPEX projects over budget

2.8×

More likely to miss schedule

6 weeks

Avg. delay in control reports without software

6 Critical Functions for Mining Projects

  1. Multi-level WBS aligned with CAPEX breakdown
  2. EVM tracking (CPI, SPI, EAC) at work-package level
  3. Long-lead equipment procurement tracking
  4. Remote site access and offline sync capability
  5. FIDIC/NEC contract milestone management
  6. Cost-at-completion forecasting with sensitivity analysis

TPLANNER vs Primavera P6 vs Excel

TPLANNER

  • ✓ Built-in EVM
  • ✓ Intuitive UI
  • ✓ ~$180/yr
  • ✓ Cloud-native
  • ✗ Newer product
  • ✗ Less legacy integrations

Primavera P6

  • ✓ Industry standard
  • ✓ Full EVM
  • ✓ Mature ecosystem
  • ✗ $2,000–16,000/yr
  • ✗ Steep learning curve
  • ✗ Desktop-first

Excel

  • ✓ Free / low cost
  • ✓ Familiar
  • ✓ Fully flexible
  • ✗ Manual EVM
  • ✗ Error-prone
  • ✗ No audit trail
  • ✗ Not scalable

Built for mining projects. Try TPLANNER free.

Start free trial