⛏️Mining

TPLANNER for
Mining

Manage extraction projects, processing plants and mining CAPEX with EVM, WBS and integrated executive reports. Designed for the complexity of the sector.

Start free→View plans

No credit card · Free · 1 active project

The problem

What makes mining project management hard

!

CAPEX that drifts in the first months

Mining projects have critical payment milestones. A 5% deviation on a $50M project is $2.5M. EVM detects the trend before the overrun consolidates.

!

Multiple contractors with no integrated visibility

Each contractor manages their own schedule. TPLANNER lets you consolidate WBS from multiple fronts in a single dashboard with performance alert traffic lights.

!

Board reports that take days to prepare

The monthly board report takes 2–3 days to prepare. With TPLANNER, the control cut automatically generates the executive report with S-curve, EVM and narrative.

The solution

TPLANNER for mining

WBS for CAPEX projects

Structure by disciplines: Civil, Mechanical, Electrical, Instrumentation. Up to 7 hierarchical levels compatible with PMI standards and project management reporting.

Baseline and version control

Freeze the contractual schedule and compare against rebaselines LC1, LC2, LC3. Change history log for audits.

Commitment and ACWP control

Record actual cost of work performed (ACWP) per work package. Compare against budget at each cut and project the final cost (EAC).

AI-generated executive narrative

AI analyses the project status and generates the executive narrative for the monthly board report in seconds. No hours of writing.

Use cases

How mining teams use TPLANNER

Case 1

Concentrator plant expansion · Cajamarca

$28M project, 18 months. The control team detected a cost overrun trend in structural concrete items in month 4.

Outcome

Materials contract renegotiation with 6 weeks' notice. Final deviation: 3.1%.

Case 2

Pump system installation · Ica

Critical 9-month project for open-pit operation. SPI of 0.87 detected in week 12 allowed resource reallocation before the critical milestone.

Outcome

Commissioning on schedule. No operational impact.

Start today

Your next mining project
under control from day 1

Free Starter plan · 1 active project · No credit card

Create free account →📊 Free EVM Calculator

Frequently asked questions

Does TPLANNER comply with PMBOK reporting standards?

Yes. EVM indicators (CPI, SPI, EAC, VAC, TCPI) follow PMI PMBOK 7th edition definitions.

Can I manage multiple simultaneous projects?

The Professional plan allows unlimited projects with an individual dashboard per project. Enterprise includes a consolidated multi-project view.

Is data safe for confidential projects?

Data is stored locally on your device (localStorage). It is not transmitted to any TPLANNER server except when you generate email reports.

Also available for

🏗️ Construction⚡ Energy🏭 Manufacturing🌉 Infrastructure💧 Sanitation

¿Quieres recibir nuevos artículos?

Escribimos sobre lo que realmente importa en la gestión de proyectos industriales.

Sin spam. Cancela cuando quieras.