Industrial-grade software · Powered by AI

Project management control
with Intelligence

TPLANNER integrates 7-level WBS, interactive Gantt, cost control, Earned Value (EVM) and Artificial Intelligence in a single platform designed for infrastructure, mining, energy and manufacturing.

WBS
7 niveles
Gantt
Interactivo
Control
de costos
Valor Ganado
(EVM)
Solo quedan 9 accesos gratuitos disponibles este mes
Sin tarjeta de crédito Gratis para empezar See features
Earned Value (EVM) with AI
7-level WBS
Modern alternative to Primavera P6
Free EVM calculator (SPI / CPI) — no sign-up required
No credit card required
Free to start
Data on your device
TPLANNER — Proyecto Subestación Flor de Nevada
Cronograma del proyecto
MesSemDía
WBS / Actividad
Q2 2024Q3Q4Q1 2025Q2Q3
1Ingeniería
1.1Ingeniería básica
1.2Ingeniería de detalle
2Procura
2.1Equipos principales
2.2Materiales
3Construcción
3.1Obras civiles
3.2Montaje
4Puesta en marcha
4.1Pruebas
4.2Arranque
Valor Ganado (EVM)
68%
PV$12.4M
EV$8.4M
AC$7.1M
Control de costos
Presupuesto$12.4M
Comprometido$9.6M
Gastado$7.1M
Indicadores del proyecto
SPI
1.12
> 1.0
CPI
1.18
> 1.0
SV
$1.2M
> 0
CV
$1.3M
> 0

Confiado por empresas líderes en proyectos complejos

Infraestructura
Minería
Energía
Manufactura
app.tplanner.io/planifica
TPLANNERWBS · GANTT · EVM · IA
Hola, usuarioSTARTER
Single-Family House Los AlamosIN PROGRESSGuardado
CodigoNombreDíasInicioFinHTNiv.Predec.Acc.
1Single-Family House18320/07/2618/01/27RCN1+1×
1.1Project Start020/07/2620/07/26RCN2+1×
1.2Preliminary Works18320/07/2618/01/27RCN2+1×
1.2.1Site fence220/07/2621/07/26RCN31.1×+1×
1.2.2Security cabin121/07/2621/07/26181dN31.2.1×+1×
1.2.3Surveying & layout4025/07/2602/09/2613dN31.2.1×+1×
1.3Earthworks5003/09/2622/10/2613dN2+1×
1.3.1Excavation503/09/2607/09/2613dN31.2.5×+1×
1.3.2Backfill1508/10/2622/10/2688dN31.3.1×+1×
Industries

Built for industries where errors are not an option

TPLANNER was built for projects where schedules, budgets and resources are critical assets.

Infrastructure

Roads, bridges, tunnels and large-scale civil works

Ver solución →

Mining

Extraction projects, processing plants and mining CAPEX

Ver solución →

Energy

Power plants, oil & gas, renewable energy and transmission

Ver solución →

Manufacturing

Industrial assembly, production lines and plant projects

Ver solución →

Construction

Buildings, urban developments and real estate projects

Ver solución →

Sanitation

Drinking water, sewage, treatment plants and EPC

Ver solución →
Ver todas las industrias
0+
Integrated features
0 levels
Hierarchical WBS
0+
EVM indicators
0 reports
Executive templates
How it works

From planning to report
in three steps

01
STEP 01

Create your WBS

Define the project structure in up to 7 hierarchical levels. Assign dates, resources and budget to each activity.

02
STEP 02

Plan and control

Visualize the Gantt, set the baseline and record actual progress at each control cut.

03
STEP 03

Analyze and report

The EVM dashboard detects deviations. AI generates executive narratives ready to present.

Features

Everything you need,
nothing you don't

Every feature was designed to solve real planning problems in high-complexity projects.

7-Level WBS

Full hierarchical breakdown: Project → Phase → Deliverable → Package → Sub-package → Task → Activity. PMI-compatible.

Interactive Gantt

Drag bars to reschedule. Predecessors with automatic arrows. Zoom and search. Critical path highlighted in real time.

Baseline & Control

Freeze the original plan and compare against actual progress. Multiple control lines (CL1, CL2…) for reprogramming audits.

Advanced Calendar

Configure working days, special shifts, national holidays and night shifts. Automatic date computation.

Import Excel / MS Project

Migrate your existing project in seconds. Upload an Excel file or MS Project XML export and TPLANNER automatically rebuilds the full WBS, dates, durations and predecessors.

ARTIFICIAL INTELLIGENCE

Your project consultant
available 24/7

Our AI assistant analyzes your project in real time and acts as a senior project manager with access to all your data.

AI

Risk Detection

Analyzes schedule, costs and EVM. Classifies risks as High, Medium and Low with concrete, actionable recommendations for each alert.

AI

Project Chat

Contextual assistant that knows your activities, progress, costs and resources in real time. Ask it anything about your project.

AI

Executive Narrative

Generates a 7-section report in seconds: description, schedule, costs, resources, EVM, risks and conclusions with cost and schedule recommendations.

Project AI Assistant
Online
Which activities are on the critical path and behind schedule?
There are 3 critical path activities with delays: (1) Column assembly — 4 days late, directly impacts the completion date. (2) Process piping — 2 days. I recommend reassigning the secondary crew to recover the schedule on assembly.
Who it's for

A tool for every
level of experience

To grow

Learning

Guided and intuitive interface. Learn project management while using the tool. Example templates included to start from scratch.

  • Ready-to-use example templates
  • Clear visual interface
  • Integrated documentation
  • Free plan with no time limit
To produce

Senior Professional

Automatic CPM, full EVM, multiple control lines and professional exports. The power an experienced planner needs.

  • Full EVM (SPI/CPI/EAC/TCPI)
  • Automatic CPM critical path
  • Multiple control lines
  • PDF and Excel pro exports
To scale

Enterprises

Collaborative environment per project. Multi-user access, standardized reports for audit and team training included.

  • Multi-user access per project
  • Reports for management, client and PMO
  • Training and onboarding included
  • Dedicated priority support

Why engineering teams choose TPLANNER

7 levelsof WBS supported
Full EVMCPI, SPI, EAC, VAC
AI built-inautomatic project narrative
no limiton activities per project
PDF exportexecutive reports ready
freeto get started today
Pricing

Plans designed for
every stage of your growth

No annual contracts. Cancel anytime.

STARTER

To explore and learn

9 cupos gratuitos restantes
$0

/ free forever


  • 1 active project
  • WBS up to level 3
  • Basic interactive Gantt
  • Import from Excel & MS Project
  • No credit card
Start free
MOST POPULAR

PROFESSIONAL

For serious planners

30-day free trial
$14.99

/ month


  • Unlimited projects
  • 7-level WBS — physical, duration & units progress
  • CPM Gantt with FS, SS, FF, SF and lags
  • Baseline + S-curve + control cuts
  • Executive report: EVM, PDF & Excel, AI narrative
  • Weekly resource load histogram
  • AI: risk analysis and executive narrative
  • Import Excel / MS Project XML
  • Real-time currency conversion
  • Executive dashboard + traffic light
Start free trial

ENTERPRISE

For teams and companies

30-day free trial
$99.99

/ month


  • Everything in Professional
  • History tab: full audit trail of control cuts
  • Up to 8 users per project
  • Collaborative multi-user access
  • Training and onboarding
  • Dedicated 24/7 support
  • API integration
Start free trial
Enterprise

Need a custom solution?

Own servers, ERP/SAP integration, custom SLA and corporate contracts.

Unlimited usersP6 / MS Project integrationDedicated SLA & supportOn-site training
Response within 24 business hours

Start planning
with full control today

No installation. No credit card. Just open the browser and start planning your project in minutes.

Create free account See demo
Feedback

Your opinion helps us improve

Tell us your experience, suggestions or questions. Our team reviews every message.

Your information is confidential and will only be used to respond to your inquiry.