Industrial-grade software · Powered by AI

Project management control
with Intelligence

TPLANNER integrates 7-level WBS, interactive Gantt, cost control, Earned Value (EVM) and Artificial Intelligence in a single platform designed for infrastructure, mining, energy and manufacturing.

WBS
7 niveles
Gantt
Interactivo
Control
de costos
Valor Ganado
(EVM)
Sin tarjeta de crédito Gratis para empezar See features
Earned Value (EVM) with AI
7-level WBS
Modern alternative to Primavera P6
Free EVM calculator (SPI / CPI) — no sign-up required
No credit card required
Free to start
Data on your device

Sectores donde se aplica

Infraestructura
Minería
Energía
Manufactura
PRODUCTO

El dashboard que tus proyectos necesitan

EVM, Curva S y ruta crítica en tiempo real — no en una hoja de cálculo.

tplanner.io/app/dashboard

Dashboard del Proyecto

Semana 32 · Actualizado hace 12 min

Avance real
0%
Planificado: 75%
SPI
0.00
Atrasado
CPI
0.00
Sobre presupuesto
EAC
$0.0M
+12% vs BAC
Curva S
PV
EV
AC
EneFebMarAbrMayJunJulAgoSepOct0%50%100%
Gantt · Ruta Crítica
Crítico
Normal
Diseño & IngenieríaCimentaciónEstructura principalInstalacionesAcabados
Principales riesgosAnálisis IA →
Retraso en entrega de acero — impacto en ruta crítica
Sobrecoste en subcontratistas (+8%) vs presupuesto
Probabilidad de lluvia semana 3 — riesgo en excavaciones
Costo vs Avance
AC
EV
MayJunJulAgo
Cálculo EVM automático
Curva S en tiempo real
Alertas con IA
Real challenges

Does this sound familiar?

The schedule slips

Activities fall behind and nobody catches the problem until the client flags it.

Costs spiral up

Budget burns faster than progress. The CPI shows it, but nobody measures it.

Reporting eats your time

Every month-end takes days of manual consolidation. Management wants numbers and you're hunting files.

Industries

Built for industries where errors are not an option

TPLANNER was built for projects where schedules, budgets and resources are critical assets.

Infrastructure

Roads, bridges, tunnels and large-scale civil works

Ver solución →

Mining

Extraction projects, processing plants and mining CAPEX

Ver solución →

Energy

Power plants, oil & gas, renewable energy and transmission

Ver solución →

Manufacturing

Industrial assembly, production lines and plant projects

Ver solución →

Construction

Buildings, urban developments and real estate projects

Ver solución →

Sanitation

Drinking water, sewage, treatment plants and EPC

Ver solución →
Ver todas las industrias
50+
Integrated features
7 levels
Hierarchical WBS
15+
EVM indicators
4 reports
Executive templates
How it works

From planning to report
in three steps

01
STEP 01

Create your WBS

Define the project structure in up to 7 hierarchical levels. Assign dates, resources and budget to each activity.

02
STEP 02

Plan and control

Visualize the Gantt, set the baseline and record actual progress at each control cut.

03
STEP 03

Analyze and report

The EVM dashboard detects deviations. AI generates executive narratives ready to present.

Features

Everything you need,
nothing you don't

Every feature was designed to solve real planning problems in high-complexity projects.

7-Level WBS

Full hierarchical breakdown: Project → Phase → Deliverable → Package → Sub-package → Task → Activity. PMI-compatible.

Interactive Gantt

Drag bars to reschedule. Predecessors with automatic arrows. Zoom and search. Critical path highlighted in real time.

Baseline & Control

Freeze the original plan and compare against actual progress. Multiple control lines (CL1, CL2…) for reprogramming audits.

Advanced Calendar

Configure working days, special shifts, national holidays and night shifts. Automatic date computation.

Import Excel / MS Project

Migrate your existing project in seconds. Upload an Excel file or MS Project XML export and TPLANNER automatically rebuilds the full WBS, dates, durations and predecessors.

ARTIFICIAL INTELLIGENCE

Your project consultant
available 24/7

Our AI assistant analyzes your project in real time and acts as a senior project manager with access to all your data.

AI

Risk Detection

Analyzes schedule, costs and EVM. Classifies risks as High, Medium and Low with concrete, actionable recommendations for each alert.

AI

Project Chat

Contextual assistant that knows your activities, progress, costs and resources in real time. Ask it anything about your project.

AI

Executive Narrative

Generates a 7-section report in seconds: description, schedule, costs, resources, EVM, risks and conclusions with cost and schedule recommendations.

Project AI Assistant
Online
Which activities are on the critical path and behind schedule?
There are 3 critical path activities with delays: (1) Column assembly — 4 days late, directly impacts the completion date. (2) Process piping — 2 days. I recommend reassigning the secondary crew to recover the schedule on assembly.
Who it's for

A tool for every
level of experience

To grow

Learning

Guided and intuitive interface. Learn project management while using the tool. Example templates included to start from scratch.

  • Ready-to-use example templates
  • Clear visual interface
  • Integrated documentation
  • Free plan with no time limit
To produce

Senior Professional

Automatic CPM, full EVM, multiple control lines and professional exports. The power an experienced planner needs.

  • Full EVM (SPI/CPI/EAC/TCPI)
  • Automatic CPM critical path
  • Multiple control lines
  • PDF and Excel pro exports
To scale

Enterprises

Collaborative environment per project. Multi-user access, standardized reports for audit and team training included.

  • Multi-user access per project
  • Reports for management, client and PMO
  • Training and onboarding included
  • Dedicated priority support

Why engineering teams choose TPLANNER

7 levelsof WBS supported
Full EVMCPI, SPI, EAC, VAC
AI built-inautomatic project narrative
no limiton activities per project
PDF exportexecutive reports ready
freeto get started today
Pricing

Plans designed for
every stage of your growth

No annual contracts. Cancel anytime.

STARTER

To explore the product

$0

/ free forever


  • 1 active project
  • WBS up to level 3
  • Basic interactive Gantt
  • Import Excel, P6 (.xer) & MS Project (.xml)
  • No credit card
Start free
MOST POPULAR

PROFESSIONAL

For serious planners

30-day free trial
$14.99

/ month


  • Unlimited projects
  • 7-level WBS — physical progress & full EVM
  • CPM Gantt: critical path, FS/SS/FF/SF predecessors
  • 4 report templates + builder + PDF & Excel
  • AI project chat and automatic executive narrative
  • T-Meet included: record & transcribe meetings with AI
Start free trial

ENTERPRISE

For teams and companies

30-day free trial
$99.99

/ month


  • Everything in Professional
  • Up to 8 collaborative users per project
  • Full history of control cuts
  • Priority support and dedicated onboarding
  • T-Meet included: record & transcribe meetings with AI
Enterprise

Need a custom solution?

Own servers, ERP/SAP integration, custom SLA and corporate contracts.

Unlimited usersP6 / MS Project integrationDedicated SLA & supportOn-site training
Response within 24 business hours
Reseñas verificadas

Lo que dicen nuestros usuarios

Reseñas reales publicadas en Capterra

Ver en Capterra
★★★★★
Capterra

"La mejor herramienta de planificación que usa la IA"

He utilizado TPLANNER para la planificación y ejecución de un proyecto, y la experiencia ha sido muy positiva. Me ha permitido organizar las actividades, controlar los tiempos y hacer seguimiento al avance de una manera mucho más dinámica y sencilla. En comparación con otros programas como Primavera, su interfaz es mucho más intuitiva y fácil de usar, lo que agiliza la programación y el control del proyecto.

J

Johana I.

Arquitecta de Acabados · Construction

Julio 2026
⭐ Dejar mi reseña en Capterra

Start planning
with full control today

No installation. No credit card. Just open the browser and start planning your project in minutes.

Create free account See demo
Feedback

Your opinion helps us improve

Tell us your experience, suggestions or questions. Our team reviews every message.

Your information is confidential and will only be used to respond to your inquiry.