Project management control
with Intelligence
TPLANNER integrates 7-level WBS, interactive Gantt, cost control, Earned Value (EVM) and Artificial Intelligence in a single platform designed for infrastructure, mining, energy and manufacturing.
7 niveles
Interactivo
de costos
(EVM)
Confiado por empresas líderes en proyectos complejos
| Codigo | Nombre | Días | Inicio | Fin | HT | Niv. | Predec. | Acc. |
|---|---|---|---|---|---|---|---|---|
| ▸1 | Single-Family House | 183 | 20/07/26 | 18/01/27 | RC | N1 | — | ✎+1× |
| 1.1 | Project Start | 0 | 20/07/26 | 20/07/26 | RC | N2 | — | ✎+1× |
| ▸1.2 | Preliminary Works | 183 | 20/07/26 | 18/01/27 | RC | N2 | — | ✎+1× |
| 1.2.1 | Site fence | 2 | 20/07/26 | 21/07/26 | RC | N3 | 1.1× | ✎+1× |
| 1.2.2 | Security cabin | 1 | 21/07/26 | 21/07/26 | 181d | N3 | 1.2.1× | ✎+1× |
| 1.2.3 | Surveying & layout | 40 | 25/07/26 | 02/09/26 | 13d | N3 | 1.2.1× | ✎+1× |
| ▸1.3 | Earthworks | 50 | 03/09/26 | 22/10/26 | 13d | N2 | — | ✎+1× |
| 1.3.1 | Excavation | 5 | 03/09/26 | 07/09/26 | 13d | N3 | 1.2.5× | ✎+1× |
| 1.3.2 | Backfill | 15 | 08/10/26 | 22/10/26 | 88d | N3 | 1.3.1× | ✎+1× |
Built for industries where errors are not an option
TPLANNER was built for projects where schedules, budgets and resources are critical assets.
Infrastructure
Roads, bridges, tunnels and large-scale civil works
Ver solución →Mining
Extraction projects, processing plants and mining CAPEX
Ver solución →Energy
Power plants, oil & gas, renewable energy and transmission
Ver solución →Manufacturing
Industrial assembly, production lines and plant projects
Ver solución →Construction
Buildings, urban developments and real estate projects
Ver solución →Sanitation
Drinking water, sewage, treatment plants and EPC
Ver solución →From planning to report
in three steps
Create your WBS
Define the project structure in up to 7 hierarchical levels. Assign dates, resources and budget to each activity.
Plan and control
Visualize the Gantt, set the baseline and record actual progress at each control cut.
Analyze and report
The EVM dashboard detects deviations. AI generates executive narratives ready to present.
Everything you need,
nothing you don't
Every feature was designed to solve real planning problems in high-complexity projects.
7-Level WBS
Full hierarchical breakdown: Project → Phase → Deliverable → Package → Sub-package → Task → Activity. PMI-compatible.
Interactive Gantt
Drag bars to reschedule. Predecessors with automatic arrows. Zoom and search. Critical path highlighted in real time.
Baseline & Control
Freeze the original plan and compare against actual progress. Multiple control lines (CL1, CL2…) for reprogramming audits.
Advanced Calendar
Configure working days, special shifts, national holidays and night shifts. Automatic date computation.
Import Excel / MS Project
Migrate your existing project in seconds. Upload an Excel file or MS Project XML export and TPLANNER automatically rebuilds the full WBS, dates, durations and predecessors.
Your project consultant
available 24/7
Our AI assistant analyzes your project in real time and acts as a senior project manager with access to all your data.
Risk Detection
Analyzes schedule, costs and EVM. Classifies risks as High, Medium and Low with concrete, actionable recommendations for each alert.
Project Chat
Contextual assistant that knows your activities, progress, costs and resources in real time. Ask it anything about your project.
Executive Narrative
Generates a 7-section report in seconds: description, schedule, costs, resources, EVM, risks and conclusions with cost and schedule recommendations.
A tool for every
level of experience
Learning
Guided and intuitive interface. Learn project management while using the tool. Example templates included to start from scratch.
- Ready-to-use example templates
- Clear visual interface
- Integrated documentation
- Free plan with no time limit
Senior Professional
Automatic CPM, full EVM, multiple control lines and professional exports. The power an experienced planner needs.
- Full EVM (SPI/CPI/EAC/TCPI)
- Automatic CPM critical path
- Multiple control lines
- PDF and Excel pro exports
Enterprises
Collaborative environment per project. Multi-user access, standardized reports for audit and team training included.
- Multi-user access per project
- Reports for management, client and PMO
- Training and onboarding included
- Dedicated priority support
Why engineering teams choose TPLANNER
Plans designed for
every stage of your growth
No annual contracts. Cancel anytime.
STARTER
To explore and learn
/ free forever
- 1 active project
- WBS up to level 3
- Basic interactive Gantt
- Import from Excel & MS Project
- No credit card
PROFESSIONAL
For serious planners
/ month
- Unlimited projects
- 7-level WBS — physical, duration & units progress
- CPM Gantt with FS, SS, FF, SF and lags
- Baseline + S-curve + control cuts
- Executive report: EVM, PDF & Excel, AI narrative
- Weekly resource load histogram
- AI: risk analysis and executive narrative
- Import Excel / MS Project XML
- Real-time currency conversion
- Executive dashboard + traffic light
ENTERPRISE
For teams and companies
/ month
- Everything in Professional
- History tab: full audit trail of control cuts
- Up to 8 users per project
- Collaborative multi-user access
- Training and onboarding
- Dedicated 24/7 support
- API integration
Need a custom solution?
Own servers, ERP/SAP integration, custom SLA and corporate contracts.
Start planning
with full control today
No installation. No credit card. Just open the browser and start planning your project in minutes.
Your opinion helps us improve
Tell us your experience, suggestions or questions. Our team reviews every message.